Installation of air conditioning, ventilation and exhaustion system and acquisitio...
Randomized clinical trial of direct restorations of non-carious cervical lesions u...
Plan of implementation of Reservation Portion Technical infrastructure costs for i...
Application of the resources of the Institutional Technical Reserve, Faculty of Pu...
Refurbishment of the Biochemistry Laboratory, with replacement of the ceiling and ...
Rehabilitation of the physical space and structure of the Research Laboratory in M...
Maintenance and Improvement of the infrastructure of the Multiuser Centers and Ani...