| Texto completo | |
| Autor(es): |
da Cruz, Jeferson Auto
;
de Salles-Neto, Luiz Leduino
;
Schenekemberg, Cleder Marcos
Número total de Autores: 3
|
| Tipo de documento: | Artigo Científico |
| Fonte: | Top; v. 32, n. 2, p. 41-pg., 2024-02-19. |
| Resumo | |
This paper addresses a novel problem inspired by a practical situation faced by a Brazilian dairy company, which presents the integration of production and a two-level storage inventory control. In the supply chain (SC) analyzed, multiple production plants, warehouses, and distribution centers are considered. The problem also involves a set of constraints related to logistical capabilities and conditions of material flow throughout the SC. We developed a mathematical model and a Monte Carlo Simulation routine that aims to assist managers in establishing a production and inventory management plan for a perishable product, considering a stochastic and non-stationary demand. A numerical illustration of the results obtained by the mathematical model and a case study are carried out on the consideration of a First-Expired, First-Out inventory management policy. Results demonstrate that the proposed method allows the analysis of safety stock and the achievement of desired service levels while promoting a reduced rate of food waste over the considered planning horizon. (AU) | |
| Processo FAPESP: | 21/03269-7 - Determinação de estrutura 3D de proteínas e materiais nanoestruturados com dados incertos via otimização |
| Beneficiário: | Luiz Leduíno de Salles Neto |
| Modalidade de apoio: | Auxílio à Pesquisa - Regular |
| Processo FAPESP: | 20/07145-8 - Uma meta-heurística adaptativa aplicada ao problema dial-a-ride e variantes |
| Beneficiário: | Cleder Marcos Schenekemberg |
| Modalidade de apoio: | Bolsas no Brasil - Pós-Doutorado |