| Texto completo | |
| Autor(es): |
Salas, Richard Wilcamango
;
Melgar-Dominguez, Ozy D.
;
Mantovani, Jose R. S.
;
IEEE
Número total de Autores: 4
|
| Tipo de documento: | Artigo Científico |
| Fonte: | 2020 IEEE PES TRANSMISSION & DISTRIBUTION CONFERENCE AND EXHIBITION - LATIN AMERICA (T&D LA); v. N/A, p. 6-pg., 2020-01-01. |
| Resumo | |
This work presents a novel strategy to solve a short-term planning problem for electrical distribution systems (EDSs) by taking advantage of the implementation of a simplification technique. This simplification technique removes nodes and circuits from the original EDS to reduce the number of variables to be considered in the planning stage. The planning problem is formulated as a mixed-integer linear programming problem and its solution determines the optimal allocation of capacitor banks (CBs) and wind-based distributed generation (DG) units. To validate the proposed strategy, three different test cases are analyzed using a 134-node system and its respective simplified 23-node EDS. Numerical results show that similar investment plans for the both systems can be obtained. (AU) | |
| Processo FAPESP: | 15/21972-6 - Otimização do planejamento e da operação de sistemas de transmissão e de distribuição de energia elétrica |
| Beneficiário: | Rubén Augusto Romero Lázaro |
| Modalidade de apoio: | Auxílio à Pesquisa - Temático |
| Processo FAPESP: | 18/12422-0 - Planejamento de Curto Prazo de Sistemas de Distribuição de Energia Elétrica Reais Através de Modelos Equivalentes |
| Beneficiário: | Ozy Daniel Melgar Dominguez |
| Modalidade de apoio: | Bolsas no Brasil - Pós-Doutorado |