Busca avançada
Ano de início
Entree
(Referência obtida automaticamente do Web of Science, por meio da informação sobre o financiamento pela FAPESP e o número do processo correspondente, incluída na publicação pelos autores.)

Multi-area environmentally constrained active-reactive optimal power flow: a short-term tie line planning study

Texto completo
Autor(es):
Pourakbari-Kasmaei, Mahdi [1] ; Rider, Marcos Julio [2] ; Sanches Mantovani, Jose Roberto [1]
Número total de Autores: 3
Afiliação do(s) autor(es):
[1] State Univ Sao Paulo, Dept Elect Engn, Ilha Solteira - Brazil
[2] Univ Estadual Campinas, Dept Syst & Energy, Campinas, SP - Brazil
Número total de Afiliações: 2
Tipo de documento: Artigo Científico
Fonte: IET GENERATION TRANSMISSION & DISTRIBUTION; v. 10, n. 2, p. 299-309, FEB 4 2016.
Citações Web of Science: 6
Resumo

This study presents a tie line planning and its effects on the operating cost and environmental issues of power systems via a novel multi-area active-reactive optimal power flow (MA-AROPF) model. In this study, the authors focus on the significant role of tie line planning on power system operation. To select an appropriate tie line, a modified sensitivity index is used, which not only reduces the operating cost and emissions, but also enhances the voltage stability of individual areas and the entire power system. These benefits are obtained by increasing the degree of freedom of the power system through providing uniform economic and emission dispatch. Moreover, in this study, to address the drawbacks of commonly used decomposition methods for solving MA-AROPF, an integrated model is proposed. An AROPF that considers the environmental effects is a highly non-linear problem, and the multi-area consideration of such problems via tie line planning makes it an even more complicated and exceedingly non-linear problem. For didactic purposes and to verify the model, a small two-area system is considered in detail, while to show the effectiveness of the proposed approach, a three-area system consisting of 14-, 30-, and 118-bus IEEE test systems is conducted. (AU)

Processo FAPESP: 14/22828-3 - Desenvolvimentos de modelos de programação não linear inteira mista para solução de problema de fluxo de potência ótimo ativo e reativo para sistemas com geradores multi-combustíveis considerando restrições ambientais
Beneficiário:Mahdi Pourakbari Kasmaei
Modalidade de apoio: Bolsas no Brasil - Pós-Doutorado
Processo FAPESP: 13/23590-8 - Desenvolvimento de sistema de gerenciamento de energia (EMS - energy management system) para redes elétricas inteligentes (Smart Grids)
Beneficiário:José Roberto Sanches Mantovani
Modalidade de apoio: Auxílio à Pesquisa - Regular