Abstract
The interior point methods for the pre-dispatch generation and transmission loss minimization cc problem of a hydro power system with topology change and security constraints are developed. The resulting matrix structure is exploited aiming an efficient implementation. Considering that the load energy demand varies along the day, the generated power should follow such variation. In the hy…