Abstract
Control charts can be by variables or by attributes. Most control charts proposed for monitoring univariate process mean use variable inspection. Recent studies propose the use of the ATTRIVAR strategy, which combines the inspection of data through attributes and variables. In the first stage, a sample size n is taken from the process and a go/no go gauge is used to decide whether the sec…