Abstract
In this proposal, the prediction of utilization of the Technical Reserve for Institutional Infrastructure of Research (RTI) of the Center for Engineering, Modeling and Applied Social Sciences (CECS) to assist in the adequacy of three research laboratories on the 8th floor of the Tower 1 (Block A) of the Federal University of ABC (UFABC) is detailed. Part of the adequacy, including archite…