Abstract
This project aims to investigate the integrated cutting stock and production scheduling problem, an optimization problem that simultaneously considers decisions related to cutting stock materials, with the goal of minimizing waste, and production scheduling, which involves the temporal allocation of tasks to available resources. The objective is to capture the interdependence between thes…