Abstract
This research work considers the multiobjective distribution system expansion planning, that otimize the expansión costs and maximum load shedding risk, considering the construction of new substations or reinforcement of the existing, construction of new feeders or replacement of the existing and wind power distributed generation based location. The traditional mixed intener non linear fo…