Advanced search
Start date
Betweenand

Mathematical models and solution methods for lot-sizing problems with time Windows

Grant number: 11/23388-9
Support Opportunities:Scholarships in Brazil - Scientific Initiation
Start date: April 01, 2012
End date: December 31, 2013
Field of knowledge:Engineering - Production Engineering - Operational Research
Principal Investigator:Maristela Oliveira dos Santos
Grantee:Lívia Chierice Corrêa de Moraes
Host Institution: Instituto de Ciências Matemáticas e de Computação (ICMC). Universidade de São Paulo (USP). São Carlos , SP, Brazil
Associated research grant:10/10133-0 - Cutting, packing, lot-sizing and scheduling problems and their integration in industrial and logistics settings, AP.TEM

Abstract

In this project, we propose the study of the mathematical models and the development of mip-based heuristics for lot-sizing with production time windows. The lot-sizing problem consists of determining the production plan that supplies the demand of a number of items without exceeding the available production capacity. The demand for all items is given in each period of a finite planning horizon. The objective is to minimize setup, holding and production costs. In the problem considered, the production of the items must occur within certain time windows. The study is based on recent articles in the literature and models and heuristics will be implemented using CPLEX optimization package. (AU)

News published in Agência FAPESP Newsletter about the scholarship:
More itemsLess items
Articles published in other media outlets ( ):
More itemsLess items
VEICULO: TITULO (DATA)
VEICULO: TITULO (DATA)