Advanced search
Start date
Betweenand

Integrated lot-sizing and cutting stock problems

Grant number: 18/19893-9
Support Opportunities:Scholarships in Brazil - Post-Doctoral
Start date: December 01, 2018
End date: September 30, 2021
Field of knowledge:Engineering - Production Engineering - Operational Research
Principal Investigator:Reinaldo Morabito Neto
Grantee:Gislaine Mara Melega
Host Institution: Centro de Ciências Exatas e de Tecnologia (CCET). Universidade Federal de São Carlos (UFSCAR). São Carlos , SP, Brazil
Associated research grant:16/01860-1 - Cutting, packing, lot-sizing, scheduling, routing and location problems and their integration in industrial and logistics settings, AP.TEM
Associated scholarship(s):19/03302-4 - Exat/Approximate Solution Approaches to the Integrated Lot-Sizing and Cutting Stock Problem, BE.EP.PD

Abstract

In this research project, we intend to investigate the integrated lot-sizing and cutting stock problem, which consists of an optimization planning problem that considers, simultaneously, the decisions related to both problems. The goal is to capture the interdependency between these decisions in order to enable economy of raw materials and reductions of production and inventory costs. New mathematical models and solution methods will be developed, exploring practical situations in which the integrated problems are addressed, such as in furniture and paper industries, and effective solution methods to solve these problems will be applied, based on case studies from companies in the state of São Paulo.

News published in Agência FAPESP Newsletter about the scholarship:
More itemsLess items
Articles published in other media outlets ( ):
More itemsLess items
VEICULO: TITULO (DATA)
VEICULO: TITULO (DATA)

Scientific publications (5)
(References retrieved automatically from Web of Science and SciELO through information on FAPESP grants and their corresponding numbers as mentioned in the publications by the authors)
SIGNORINI, CAROLINE DE ARRUDA; DE ARAUJO, SILVIO ALEXANDRE; MELEGA, GISLAINE MARA. One-dimensional multi-period cutting stock problems in the concrete industry. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, . (16/01860-1, 18/14895-3, 18/10284-0, 13/07375-0, 18/19893-9)
SIGNORINI, CAROLINE DE ARRUDA; DE ARAUJO, SILVIO ALEXANDRE; MELEGA, GISLAINE MARA. One-dimensional multi-period cutting stock problems in the concrete industry. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v. 60, n. 8, p. 18-pg., . (18/10284-0, 13/07375-0, 18/14895-3, 16/01860-1, 18/19893-9)
MELEGA, GISLAINE MARA; DE ARAUJO, SILVIO ALEXANDRE; MORABITO, REINALDO. Mathematical model and solution approaches for integrated lot-sizing, scheduling and cutting stock problems. ANNALS OF OPERATIONS RESEARCH, v. 295, n. 2, p. 695-736, . (18/19893-9, 16/01860-1, 13/07375-0)
SIGNORINI, CAROLINE DE ARRUDA; DE ARAUJO, SILVIO ALEXANDRE; POLTRONIERE, SONIA CRISTINA; MELEGA, GISLAINE MARA. One-dimensional multi-period cutting stock problem with two stages applied to lattice slab production. Journal of the Operational Research Society, v. N/A, p. 15-pg., . (18/14895-3, 13/07375-0, 16/01860-1, 18/10284-0, 18/19893-9)
SILVA, EDUARDO M.; MELEGA, GISLAINE M.; AKARTUNALI, KEREM; DE ARAUJO, SILVIO A.. Formulations and theoretical analysis of the one-dimensional multi-period cutting stock problem with setup cost. European Journal of Operational Research, v. 304, n. 2, p. 18-pg., . (13/07375-0, 18/19893-9, 16/01860-1)