The design of simple subcontracting rules for make-to-order shops: An assessment by simulation

Full text
Author(s):
Thuerer, Matthias [1] ; Stevenson, Mark [2] ; Qu, Ting [3] ; Filho, Moacir Godinho [4]
Total Authors: 4
Affiliation:
[1] Jinan Univ, Guangzhou 510632 - Peoples R China
[2] Univ Lancaster, Sch Management, Dept Management Sci, Lancaster LA1 4YX - England
[3] Guangdong Univ Technol, Sch Electromech Engn, Guangdong CIMS Prov Key Lab, Guangzhou, Guangdong - Peoples R China
[4] Dept Ind Engn, BR-13565905 Sao Carlos, SP - Brazil
Total Affiliations: 4
Document type: Journal article
Source: European Journal of Operational Research; v. 239, n. 3, p. 854-864, DEC 16 2014.
Web of Science Citations: 4
Abstract

Subcontracting can be an important means of overcoming capacity shortages and of workload balancing, especially in make-to-order companies characterized by high variety, high demand variation and a job shop configuration. But there is a lack of simple, yet powerful subcontracting rules suitable for such contexts. The few existing rules were developed for single work center shops and neglect the actual subcontracting lead time, meaning some subcontracted jobs are destined to become tardy. This study uses Workload Control theory on matching required and available capacity over time to propose four new rules that address these shortcomings. The new rules are compared against four existing rules using an assembly job shop simulation model where the final, assembled product consists of several sub-assemblies that either flow through an internal job shop or are subcontracted. The best new rules stabilize the direct load queuing in front of a work center and significantly improve performance compared to the existing rules. For example, when the workload exceeds capacity by 10%, a 50% reduction in percentage tardy can be achieved. By examining how the workload behaves over time, we reveal that improvements come from selectively subcontracting the sub-assemblies that would otherwise cause overloads, thereby cutting off peaks in the workload. (C) 2014 Elsevier B.V. All rights reserved. (AU)

FAPESP's process: 11/10605-1 - Proposal of a Decision Support System based on Workload Control approach for production planning and control in small and medium companies