Advanced search
Start date
Betweenand
(Reference retrieved automatically from Web of Science through information on FAPESP grant and its corresponding number as mentioned in the publication by the authors.)

NEW HEURISTICS FOR THE NO-WAIT FLOWSHOP WITH SEQUENCE-DEPENDENT SETUP TIMES PROBLEM

Full text
Author(s):
Araujo, Danielle Castro [1] ; Naganoa, Marcelo Seido [1]
Total Authors: 2
Affiliation:
[1] Univ Sao Paulo, Sao Paulo, SP - Brazil
Total Affiliations: 1
Document type: Journal article
Source: BRAZILIAN JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT; v. 12, n. 2, p. 180-194, DEC 2015.
Web of Science Citations: 0
Abstract

In this paper, we address the problem of scheduling jobs in a no-wait flow shop with sequence-dependent setup times with the objective of minimizing the make span and the total flow time. As this problem is well-known for being NP-hard, we present two new constructive heuristics in order to obtain good approximate solutions for the problem in a short CPU time, named GAPH and QUARTS. GAPH is based on a structural property for minimizing make span and QUARTS breaks the problem in quartets in order to minimize the total flow time. Experimental results demonstrate the superiority of the proposed approaches over three of the best-know methods in the literature: BAH and BIH, from Bianco, Dell'Olmo and Giordani (1999) and TRIPS, by Brown, McGarvey and Ventura (2004). (AU)

FAPESP's process: 09/06832-2 - Flowshop no-wait scheduling with sequence dependent setup times
Grantee:Daniella Castro Araujo
Support Opportunities: Scholarships in Brazil - Master