Advanced search
Start date
Betweenand
(Reference retrieved automatically from SciELO through information on FAPESP grant and its corresponding number as mentioned in the publication by the authors.)

TIME LIFE THE “VELHA” DAM BASINS OF THE STREAM BARRINHA, PIRASSUNUNGA, SÃO PAULO STATE, BRAZIL

Full text
Author(s):
A.G.M. Bufon [1] ; S.M. Tauk-Tornisielo [2] ; A.C.S. Pião [3]
Total Authors: 3
Affiliation:
[1] Universidade Estadual Paulista. Centro de Estudos Ambientais - Brasil
[2] Universidade Estadual Paulista. Centro de Estudos Ambientais - Brasil
[3] Universidade Estadual Paulista. Instituto de Geociências e Ciências Exatas. Departamento de Estatística, Matemática Aplicada e Computação - Brasil
Total Affiliations: 3
Document type: Journal article
Source: Arq. Inst. Biol.; v. 76, n. 4, p. 673-679, 2021-06-25.
Abstract

ABSTRACT Conservation of continental waters is becoming increasingly necessary due to the growing negative environmental impacts and the acceleration of its scarcity. In the Center of Research and Management of Continental Fishing Resources (CEPTA/IBAMA), city of Pirassununga, SP, Brazil, located in the “Velha” dam. The lifespan of this dam was determined by sedimentation rate, comparing two different methodologies. One was the bathymetry with a hydrometric and other hydrometric using sedimentation chambers. The samples collections in these last ones had occurred in the water column the 50 cm above the sediment, in the dry and rainy periods, during twelve months. With this methodology can be calculated the sediment rate of 7.0 mg.cm-2day-1 and 0.66 mg.cm-3 annual density. The calculation of lifetime for the “Velha” dam was 7.5 years. Through the bathymetry was determined the loss of depth along the entire length of this dam, with an average, of 0.07 m.year-1. It was concluded it will take 72 years for this dam to be completely silted up, this time can be reduced if no mitigating actions for the current impacts and planning to avoid others who may possibly occur. (AU)