Advanced search
Start date
Betweenand

Integration of chemical processes in real time

Grant number: 98/14384-3
Support type:Research Projects - Thematic Grants
Duration: April 01, 1999 - February 29, 2008
Field of knowledge:Engineering - Chemical Engineering
Principal Investigator:Rubens Maciel Filho
Grantee:Rubens Maciel Filho
Home Institution: Faculdade de Engenharia Química (FEQ). Universidade Estadual de Campinas (UNICAMP). Campinas , SP, Brazil
Co-Principal Investigators:Darci Odloak ; Maria Regina Wolf Maciel
Associated scholarship(s):08/01230-1 - Real time processes integration: one layer approach, BP.PD
05/52580-4 - Modeling and simulation for correlations of polyethylene (PE) characteristics and final properties for individual products, BP.MS

Abstract

The present project concerns the establishment of integration strategies of continuous chemical processes in real time and the tools necessary for its implementation. Several chemical processes will be used for application, in addition to models of unitary operations, models of planning and production control will be proposed. Hierarchical structures will be defined, which aim to meet the objectives of control and economy, techniques of robust syntony as well as numerical algorithms of identification of the structure of models and of the resolution of problems of non-linear programming and complete mixed non-linear programming of huge capacity will be developed. (AU)

Scientific publications (11)
(References retrieved automatically from Web of Science and SciELO through information on FAPESP grants and their corresponding numbers as mentioned in the publications by the authors)
CARRAPIÇO‚ OL; ODLOAK‚ D. A stable model predictive control for integrating processes. Computers & Chemical Engineering, v. 29, n. 5, p. 1089-1099, 2005.
ALLE‚ A.; PAPAGEORGIOU‚ L.G.; PINTO‚ J.M. A mathematical programming approach for cyclic production and cleaning scheduling of multistage continuous plants. Computers & Chemical Engineering, v. 28, n. 1, p. 3-15, 2004.
ALLE‚ A.; PINTO‚ J.M.; PAPAGEORGIOU‚ L.G. The economic lot scheduling problem under performance decay. Industrial & Engineering Chemistry Research, v. 43, n. 20, p. 6463-6475, 2004.
ALLE‚ A.; PINTO‚ JM. Global optimization for the cyclic scheduling and operation of multistage continuous plants. Industrial & Engineering Chemistry Research, v. 43, n. 6, p. 1485-1498, 2004.
JOLY‚ M.; PINTO‚ J.M. Optimal control of product quality for batch nylon-6‚ 6 autoclaves. CHEMICAL ENGINEERING JOURNAL, v. 97, n. 2, p. 87-101, 2004.
RODRIGUES‚ M.A.; ODLOAK‚ D. An infinite horizon model predictive control for stable and integrating processes. Computers & Chemical Engineering, v. 27, n. 8, p. 1113-1128, 2003.
A. ALLE; J.M. PINTO. A general framework for simultaneous cyclic scheduling and operational optimization of multiproduct continuous plants. Brazilian Journal of Chemical Engineering, v. 19, n. 4, p. 457-466, Dez. 2002.
ALLE‚ A.; PINTO‚ JM. Mixed-integer programming models for the scheduling and operational optimization of multiproduct continuous plants. Industrial & Engineering Chemistry Research, v. 41, n. 11, p. 2689-2704, 2002.
ZANIN‚ AC; ODLOAK‚ D.; OTHERS. Integrating real-time optimization into the model predictive controller of the FCC system. CONTROL ENGINEERING PRACTICE, v. 10, n. 8, p. 819-831, 2002.
Robust predictive control of a gasoline debutanizer column. Brazilian Journal of Chemical Engineering, v. 17, n. 4-7, p. -, Dez. 2000.

Please report errors in scientific publications list by writing to: cdi@fapesp.br.