Agile project management: proposal and evaluation of a method for scope and time management

Full text
Author(s):
Edivandro Carlos Conforto
Total Authors: 1
Document type: Master's Dissertation
Press: São Carlos.
Institution: Universidade de São Paulo (USP). Escola de Engenharia de São Carlos (EESC/SBD)
Defense date:
Examining board members:
Daniel Capaldo Amaral; Henrique Rozenfeld; José Carlos de Toledo
Advisor: Daniel Capaldo Amaral
Abstract

The high demand for innovative products has been treated as a challenge for the adoption of traditional project management (PM) practices and methods, specially those ones developed in turbulent and complex business environments. Recently, an alternative approach to deal with these challenges emerged. This approach, entitled Agile Project Management (APM), firstly applied in the software development area, is based on a set of principles which has the purpose to keep the management process as simple as possible, becoming more flexible and self-manageable. By focusing on continuous learning using constant iterations and rapid value deliverable driven, APM aims to improve the results for clients in face of turbulent business environment. However, there is lack on the literature regarding APM principles application in new product development (NPD) projects. The aim of this research is to investigate this issue and the practical application of those principles to NPD projects, developed under turbulent and innovative business environments. To achieve this goal the following strategy was adopted: develop, implement and evaluate a method for planning and controlling scope and time. It was based on a set of principles extracted from the APM literature. The method developed was entitled IVPM2 (Iterative and Visual Project Management Method) and its creation comprised an extensive literature review combined with a pure action-research methodology carried out in two small technology-based companies from the São Carlos technological pole. The companies were called Company A and Company B, and the IVPM2 development, implementation and evaluation activities occurred simultaneously in both companies, considering two distinct scenarios. In the company A the IVPM2 was implemented in a single long term project, with a high level of complexity and innovation. In the company B the IVPM2 was implemented in more than one project (a total of 7 projects) with less complexity and innovation aspects. In order to evaluate the IVPM2 adherence and contribution to project management a statistic descriptive approach was applied using qualitative and quantitative data. The data was collected by questionnaire, interviews and document analysis. The main purpose of this evaluation was to respond the central research problem and the specific research questions. The central research problem was described as: Is it possible to apply APM principles for planning and controlling innovative product projects? Consequently, the specific research questions considered after the method implementation were: RQ1) Did IVPM2 adhere to APM principles? RQ2) Did IVPM2 contribute to enhance project management process in the companies under study? The results showed many evidences of the presence of APM principles in the IVPM2 as stated in the literature. Moreover, the IVPM2 was capable to enhance many aspects of project management process of new product development in both companies studied. It also contributed to improve other aspects not directly addressed in the current research. Finally, the evidences collected during the research have indicated many benefits by combining principles from APM approach with traditional PM techniques and a PM software to support project management. This result is important to consider the applicability and viability of APM principles application to NPD projects in turbulent, innovative and complex business environments. Finally, this study has presented many indications of the need to explore this theme and improve the analysis and the IVPM2 components in order to implement them in different companies and project contexts. (AU)