Advanced search
Start date
Betweenand
(Reference retrieved automatically from Web of Science through information on FAPESP grant and its corresponding number as mentioned in the publication by the authors.)

A Multi-Stage Stochastic Non-Linear Model for Reactive Power Planning Under Contingencies

Full text
Author(s):
Lopez, Julio Cesar [1, 2] ; Contreras, Javier [3] ; Munoz, Jose I. [3] ; Mantovani, J. R. S. [1, 2]
Total Authors: 4
Affiliation:
[1] Sao Paulo State Univ UNESP, Dept Elect Engn, Ilha Solteira, SP - Brazil
[2] Sao Paulo State Univ UNESP, Elect Power Syst Planning Lab, Ilha Solteira, SP - Brazil
[3] Univ Castilla La Mancha, Escuela Tecn Super Ingn Ind, E-13071 Ciudad Real - Spain
Total Affiliations: 3
Document type: Journal article
Source: IEEE Transactions on Power Systems; v. 28, n. 2, p. 1503-1514, MAY 2013.
Web of Science Citations: 20
Abstract

This paper presents a model for long-term reactive power planning where a deterministic nonlinear model is expanded into a multi-stage stochastic model under load uncertainty and an N-k contingency analysis. Reactive load shedding is introduced in the objective function to measure the reactive power deficit after the planning process. The objective is to minimize the sum of investment costs (IC), expected operation costs (EOC) and reactive load shedding costs optimizing the sizes and locations of new reactive compensation equipment to ensure power system security in each stage along the planning horizon. An efficient scenario generation and reduction methodology is used for modeling uncertainty. Expected benefits are calculated to establish the performance of the expected value with perfect information (EVPI) and the value of the stochastic solution (VSS) methodologies. The efficacy of the proposed model is tested and justified by the simulation results using the Ward-Hale 6-bus and the IEEE 14-bus systems. (AU)

FAPESP's process: 09/53841-7 - Planning, analysis and reliability of electrical power systems
Grantee:José Roberto Sanches Mantovani
Support Opportunities: Multi-user Equipment Program
FAPESP's process: 10/16728-5 - VAr Planning of Multi-Areas Power Systems Taking into Account Stochastic Models.
Grantee:Julio César López Quizhpi
Support Opportunities: Scholarships in Brazil - Doctorate