Advanced search
Start date
Betweenand

Setting up of an integrated model factory for simulation of several scenarios in the production environment

Grant number: 92/03149-7
Support Opportunities:Research Projects - Thematic Grants
Start date: June 01, 1993
End date: July 31, 1996
Field of knowledge:Engineering - Mechanical Engineering
Principal Investigator:Henrique Rozenfeld
Grantee:Henrique Rozenfeld
Host Institution: Escola de Engenharia de São Carlos (EESC). Universidade de São Paulo (USP). São Carlos , SP, Brazil
Associated research grant(s):94/01563-6 - Workflow modelling for advanced manufacturing concepts, AR.EXT

Abstract

Installation of a second scenario within the integrated model design factory. To this end, a hardware architecture is being proposed which will support the simulation of three different production scenarios over the course of the two year project. There will need to be a conceptual evolution of the vast majority of the applications developed/under development in this Institution, as well as evolutions in the actual design of data bases and of the existing concept of the management of the flow of information. (AU)

Articles published in Agência FAPESP Newsletter about the research grant:
More itemsLess items
Articles published in other media outlets ( ):
More itemsLess items
VEICULO: TITULO (DATA)
VEICULO: TITULO (DATA)