Advanced search
Start date
Betweenand
(Reference retrieved automatically from Web of Science through information on FAPESP grant and its corresponding number as mentioned in the publication by the authors.)

The cutting stock problem with multiple manufacturing modes applied to a construction industry

Full text
Author(s):
Lemos, Felipe Kesrouani [1] ; Cherri, Adriana Cristina [2] ; de Araujo, Silvio Alexandre [3]
Total Authors: 3
Affiliation:
[1] UNESP Sao Paulo State Univ, Fac Engn Bauru, Sao Paulo - Brazil
[2] UNESP Sao Paulo State Univ, Fac Ciencias, Sao Paulo - Brazil
[3] UNESP Sao Paulo State Univ, Inst Biociencias Letras & Ciencias Exatas, Sao Paulo - Brazil
Total Affiliations: 3
Document type: Journal article
Source: INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH; v. 59, n. 4, p. 1088-1106, FEB 16 2021.
Web of Science Citations: 6
Abstract

This paper addresses the problem of multiple manufacturing modes integrated into the cutting stock problem, based on a real-life application of the concrete pole manufacturing. The main aim is to propose, formulate and test this integrated problem, which can be applied to the construction industry and other contexts of multiple manufacturing modes with cutting processes. The motivation for this proposal is the construction industry, in which reinforced concrete structures can be reinforced by various combinations of one-dimensional steel bars of varying thicknesses and lengths. An integer programming mathematical formulation is proposed aiming to minimise the total cost and to meet a demand of final products with different possible configurations. A column generation procedure is used as the solution method together with a heuristic procedure to find an integer solution. Computational results were performed with practical instances in order to assess the value of the approach and with a set of random generated instances in order to explore the influence of parameters on the results. Some managerial insights are presented. (AU)

FAPESP's process: 16/01860-1 - Cutting, packing, lot-sizing, scheduling, routing and location problems and their integration in industrial and logistics settings
Grantee:Reinaldo Morabito Neto
Support Opportunities: Research Projects - Thematic Grants
FAPESP's process: 13/07375-0 - CeMEAI - Center for Mathematical Sciences Applied to Industry
Grantee:Francisco Louzada Neto
Support Opportunities: Research Grants - Research, Innovation and Dissemination Centers - RIDC