Advanced search
Start date
Betweenand
(Reference retrieved automatically from Web of Science through information on FAPESP grant and its corresponding number as mentioned in the publication by the authors.)

Multistage Transmission Expansion Planning Considering Fixed Series Compensation Allocation

Full text
Author(s):
Rahmani, Mohsen [1, 2] ; Vinasco, Guillermo [3, 4] ; Rider, Marcos J. [2] ; Romero, Ruben [2] ; Pardalos, Panos M. [1]
Total Authors: 5
Affiliation:
[1] Univ Florida, Gainesville, FL 32611 - USA
[2] UNESP, Fac Engn Ilha Solteira, Dept Engn Eletr, Ilha Solteira, SP - Brazil
[3] Univ Antioquia, GIMEL Grp, Medellin - Colombia
[4] Interconex Elect SA ISA, Medellin - Colombia
Total Affiliations: 4
Document type: Journal article
Source: IEEE Transactions on Power Systems; v. 28, n. 4, p. 3795-3805, NOV 2013.
Web of Science Citations: 17
Abstract

This paper proposes a mathematical model for multistage transmission expansion planning (TEP) considering fixed series compensation (FSC) allocation and N-1 security constraints for both transmission lines and FSCs. FSCs can increase the transmission lines transfer capacity, but the importance of using them in TEP is to dispatch the power more efficiently, resulting in a different topology with less investment cost compared with planning without FSCs. This problem is modeled as a linear mixed binary programming problem and is solved by a commercial branch-and-cut solver to obtain the optimum solution. FSC is modeled as a fixed impedance located in the transmission lines in discrete steps and with an investment cost based on the prices of reinforcement lines. The results obtained using two known test systems show the economic benefits of using FSC in multistage TEP problems. (AU)

FAPESP's process: 11/20465-2 - Formulation of specialized metaheuristics applied to the problem of expansion planning of transmission systems
Grantee:Mohsen Rahmani
Support Opportunities: Scholarships abroad - Research Internship - Doctorate